Events
|
Blog
|
News
|
Contact
Pre-Shift Mobile Crane Inspection
Division
*
Choose Division
Great Lakes
Midwest
Mountain States
Location
*
Crystal Lake - Production
Valders - Field
Valders - Production
Waukesha - Field
Waukesha - Machinery
Location
*
Albany
Field
Rosemount
Sealant
Wells
Location
*
West Division Field
West Division Plant
West Division Sealant
Area
*
Hour Meter Reading
*
Inspector's Initials
*
Pre-Operational Check
Boom
*
OK
Needs Attention
Boom Extension, Jibs
*
OK
Needs Attention
Boom Sheaves
*
OK
Needs Attention
Fire Extinguisher Fully Charged
*
OK
Needs Attention
Fluid Leaks
*
OK
Needs Attention
Fluid Levels
*
OK
Needs Attention
Guards
*
OK
Needs Attention
Hoist Drum(s)
*
OK
Needs Attention
Hooks
*
OK
Needs Attention
Outriggers/Pads
*
OK
Needs Attention
Structural Welds
*
OK
Needs Attention
Tire Condition/Pressure
*
OK
Needs Attention
Wire Rope. Beckets. Pins
*
OK
Needs Attention
Data Plate Visible and Legible
*
OK
Needs Attention
Operational Check
Back-up Horn
*
OK
Needs Attention
Brakes
*
OK
Needs Attention
Control/Function
*
OK
Needs Attention
Electrical Equipment
*
OK
Needs Attention
Gauges
*
OK
Needs Attention
Housekeeping
*
OK
Needs Attention
Lights, Signals
*
OK
Needs Attention
Horn
*
OK
Needs Attention
Load Charts
*
OK
Needs Attention
Operational Aids
*
OK
Needs Attention
Operators Manual
*
OK
Needs Attention
Steering
*
OK
Needs Attention
Swing Locks and Brakes
*
OK
Needs Attention
Warning Labels
*
OK
Needs Attention
All Pass or Fail
*
Pass
Fail
If any of the above criteria have been marked as "Needs Attention", please mark this as failed.
Comments
This checklist must be completed daily.
If this equipment is found to be unsafe, it should be locked out and the condition reported immediately.
The operator is responsible to write work orders for all deficiencies noted during the inspection; work orders should be submitted to your manager for approval.
Name
This field is for validation purposes and should be left unchanged.