Events
|
Blog
|
News
|
Contact
Pre-Shift Tucker Inspection
Division
*
Choose Division
Great Lakes
Midwest
Mountain States
Location
*
Crystal Lake - Production
Valders - Field
Valders - Production
Waukesha - Field
Waukesha - Machinery
Location
*
Albany
Field
Rosemount
Sealant
Wells
Location
*
West Division Field
West Division Plant
West Division Sealant
Area
*
Hour Meter Reading
*
Inspector's Initials
*
Pre-Operational Check
Battery
*
OK
Needs Attention
Engine Oil
*
OK
Needs Attention
Coolant
*
OK
Needs Attention
Hydraulic Oil Level
*
OK
Needs Attention
Radiator
*
OK
Needs Attention
Fuel Level
*
OK
Needs Attention
Check Welds
*
OK
Needs Attention
Grease Fittings
*
OK
Needs Attention
Tires
*
OK
Needs Attention
Oil Leaks
*
OK
Needs Attention
Mirrors
*
OK
Needs Attention
Operational Check
Gauges and Instruments
*
OK
Needs Attention
Horn
*
OK
Needs Attention
Back-up Alarm
*
OK
Needs Attention
Brakes
*
OK
Needs Attention
Parking Brake
*
OK
Needs Attention
Headlights
*
OK
Needs Attention
Controls: Forward & Reverse
*
OK
Needs Attention
Controls: Tilt & Pivot
*
OK
Needs Attention
Seat and Seatbelts
*
OK
Needs Attention
Steering
*
OK
Needs Attention
All Pass or Fail
*
Pass
Fail
If any of the above criteria have been marked as "Needs Attention", please mark this as failed.
Comments
This checklist must be completed daily.
If this equipment is found to be unsafe, it should be locked out and the condition reported immediately.
3. No PIV shall be operated with a leak in the fuel or hydraulic system.