SEE Tracker Entries

NameSteve Arndt
Date03/01/2021
Time06:00 AM
SiteWells
AreaFS24 - west plant
Safety TopicOther
Severity1
Exposure4
Priority1
TTL Summary3 - 5 = Low Risk | 6 - 9 = Moderate Risk | 10 - 12 = High Risk
Ttl6
Root Cause(s)

I was around the strongbacks as Conner Zabel was hooking up the strongbacks to the craneways and I noticed one of the pins that run through the shackle was not screwed in all the way.

StatusCompleted
Completion Date03/04/2021
Corrective Action

Since Conner was hooking them up and he is a guy that strips everyday I pointed this out to Conner that the pins need to be screwed in tight and then turned back a 1/4 of a turn after you get them tight. I told him that we need to look at these pins periodically to make sre they are tight. Especially now with all the big panels that are coming out of the west plant.

Entry Comments
Notes for this entry
There are no notes.
Wells Site: Alert Level = Moderate Risk (ID: 59b01b9372ce7)
added on March 4, 2021 at 10:21 am

WordPress successfully passed the notification email to the sending server.