SEE Tracker Entries

NameGeoff Norrena
Date08/16/2021
Time02:00 PM
AreaAll bed locations (inside and outside)
Safety TopicGeneral Communication
Severity2
Exposure4
Priority2
TTL Summary3 - 5 = Low Risk | 6 - 9 = Moderate Risk | 10 - 12 = High Risk
Ttl8
Root Cause(s)

Communication on radios. Almost always only Spanish is used on the radio, and not mentioned in English. Which bed is ready, and even when a batch is ready to be tested. I have to try to figure out what is being said.

StatusNeeds Attention
Corrective Action

necessary information needs to be in English when it involves the status of a bed or when concrete is headed to QC for testing

Entry Comments
Notes for this entry
There are no notes.
West - Plant: Alert Level = Moderate Risk (ID: 5f2d65b797cdf)
added on August 16, 2021 at 8:41 pm

WordPress was unable to send the notification email.
Cannot send email because the TO address is invalid.