SEE Tracker Entries
Name | Boyd Clay |
---|---|
Date | 12/29/2021 |
Time | 11:00 AM |
Area | 6 and Santa Fe |
Safety Topic | Safe Operation |
TTL Summary | 3 - 5 = Low Risk | 6 - 9 = Moderate Risk | 10 - 12 = High Risk |
Ttl | 0 |
Root Cause(s) | The contractor installed a walk bridge to the first level. told the crew to tie our yellow tape to both sides so they never get out side the tape and no need to tie-off. |
Status | Completed |
Completion Date | 12/30/2021 |
Entry Comments |