SEE Tracker Entries
Name | C.J. Meyer |
---|---|
Date | 01/04/2022 |
Time | 03:40 AM |
Site | Wells |
Area | FS 24 |
Safety Topic | Safe Operation |
TTL Summary | 3 - 5 = Low Risk | 6 - 9 = Moderate Risk | 10 - 12 = High Risk |
Ttl | 0 |
Root Cause(s) | We had to release strand because only 1 piece was poured and there was a lot of residual strand under stress above the deck. Everyone did their job and stayed in the safe zones while detensioning the strand. |
Status | Completed |
Completion Date | 01/04/2022 |
Entry Comments |