SEE Tracker Entries
Name | DOUG E GALLEGOS |
---|---|
Date | 02/18/2022 |
Time | 07:00 AM |
Area | The Link At Fitzsimons |
Safety Topic | Unsafe Operation |
Severity | 4 |
Exposure | 3 |
Priority | 4 |
TTL Summary | 3 - 5 = Low Risk | 6 - 9 = Moderate Risk | 10 - 12 = High Risk |
Ttl | 11 |
Root Cause(s) | Erected a 36'-8" tall load bearing column missing the (2) v-pocket when it was produced in the plant. |
Status | Completed |
Completion Date | 02/19/2022 |
Corrective Action | We stopped erection on that bay and pulled it back to plum with cables and coma longs. |
Entry Comments |