SEE Tracker Entries
Name | DOUG E GALLEGOS |
---|---|
Date | 02/26/2022 |
Time | 07:30 AM |
Area | The Link at Fitzsimons |
Safety Topic | Unsafe Operation |
Severity | 3 |
Exposure | 2 |
Priority | 3 |
TTL Summary | 3 - 5 = Low Risk | 6 - 9 = Moderate Risk | 10 - 12 = High Risk |
Ttl | 8 |
Root Cause(s) | 02/25/22 |
Status | Needs Attention |
Corrective Action | There needed to be a spotter on the concrete slab when moving the boom lift with all the PVC Pipes stubs in this area. |
Follow Up Actions | I will meet with a three men on Monday and investigate why no spotter was on the ground when the boom lift was moved back and forth on this area. |
Entry Comments |