SEE Tracker Entries
Name | kristian zapata |
---|---|
Date | 03/08/2022 |
Time | 08:00 AM |
Area | load out |
Safety Topic | Other |
Severity | 1 |
Exposure | 1 |
Priority | 3 |
TTL Summary | 3 - 5 = Low Risk | 6 - 9 = Moderate Risk | 10 - 12 = High Risk |
Ttl | 5 |
Root Cause(s) | One of my operators was loading a flat slab for the link, the piece is a fss-bk there is 2 in storage side by side in row-12 one has a rake finish the other has a float. |
Status | Needs Attention |
Corrective Action | I had Geoff with QC pull a print and he confirmed that the finish is supposed to be a float. |
Follow Up Actions | I have gotten ahold of the engineer, I am waiting to hear back if the piece with the rake will be acceptable. |
Entry Comments |