Events
|
Blog
|
News
|
Contact
Stressing Jack Pre-Shift Inspection
Division
*
Choose Division
Great Lakes
Midwest
Mountain States
Location
*
Crystal Lake - Production
Valders - Field
Valders - Production
Waukesha - Field
Waukesha - Machinery
Location
*
Albany
Field
Rosemount
Sealant
Wells
Location
*
West Division Field
West Division Plant
West Division Sealant
Area
*
Inspector's Initials
*
Operational Check
Filter Screen Clean
*
OK
Needs Attention
Free of Debris
*
OK
Needs Attention
Hydraulic Oil Level
*
OK
Needs Attention
Oil Leaks Present
*
OK
Needs Attention
Nuts, Bolts and Fittings
*
OK
Needs Attention
Ram Jack (cracks or fatigue)
*
OK
Needs Attention
Warning Signals Functional
*
OK
Needs Attention
"O" Rings Functional
*
OK
Needs Attention
Stressing Guards in Place
*
OK
Needs Attention
Stressing Guards Adequate
*
OK
Needs Attention
Stressing Guards Bolted Down
*
OK
Needs Attention
Reset Initial & Final Cut-off Valves to Zero
*
OK
Needs Attention
Tire Condition
*
OK
Needs Attention
Test Stressing Operation
*
OK
Needs Attention
Test Stressing Operation
*
OK
Needs Attention
Extend & Retract the Ram Function
*
OK
Needs Attention
Gages Functioning
*
OK
Needs Attention
Crews Properly Trained
*
OK
Needs Attention
All Pass or Fail
*
Pass
Fail
If any of the above criteria have been marked as "Needs Attention", please mark this as failed.
Comments
This checklist must be completed daily.
If equipment is found to be unsafe, ask maintenance to lock and tag out. Complete a work order request.
No equipment shall be operated with a leak in the fuel system.
Name
This field is for validation purposes and should be left unchanged.