Observer Name | Samuel Guidarelli |
---|---|
Date of Inspection | 12/03/2019 |
Site | Field (Wells) |
Area / Job | Brainard HS |
House Keeping | 5 |
Rigging | 5 |
Machines and tools | 4 |
Falls Hazards | 4 |
PPE & Signage | 5 |
Electrical | 5 |
Hot Work | 5 |
Heavy Equipment Operation | 3 |
Comments (Heavy Equipment Operation) | Tall 50’ panels only 60’ JLG. Lot of extra driving around to reposition. Need 80’ lift to reach better. |
Ergonomics/ Lifting/ Carrying/ Repetitive | 5 |
Inspection Total | 41 |