Observer NameTom Peterson
Date of Inspection11/20/2019
SiteField (Wells)
Area / JobRochester / 7096
House Keeping4
Rigging3
Comments (Rigging)

Top Burke insert was missed by production. Ryan checked capacity of remaining burkes against the panel weight and said it was good to lift.

Machines and tools4
Falls Hazards4
PPE & Signage4
Electrical3
Comments (Electrical)

Overhead power line is close to our crane work. The air was very damp so we had to ground to the outrigger to avoid shocks. We also set up delineating posts with ribbon to mark the area.

Hot Work4
Heavy Equipment Operation4
Ergonomics/ Lifting/ Carrying/ Repetitive4
Inspection Total34