Observer NameTom Peterson
Date of Inspection09/18/2019
SiteField (Wells)
Area / JobEide Bailly Center / Job# 6927
House Keeping4
Rigging4
Machines and tools4
Falls Hazards3
Comments (Fall Hazards)

Talked to crew about using the ramps perimeter cable as an anchorage connection. I am getting Darik two cross arm straps to use for tie off in these situations.

PPE & Signage3
Comments (PPE & Signage)

The crane was set up in an area of roadway that was barricaded. The counter weight was very close to traffic when rotating.

Electrical4
Hot Work4
Heavy Equipment Operation4
Ergonomics/ Lifting/ Carrying/ Repetitive4
Photos of Issueimage6.jpg
Inspection Total34